Technical Drawings & Building Regulations
Technical Drawing Package
Comprehensive construction drawings including general arrangement plans, sections, elevations, and architectural details—prepared to comply with UK Building Regulations and suitable for pricing and construction.
Project Specification
A room-by-room written specification covering finishes, fixtures, and detailing (e.g., flooring, joinery, guttering) to avoid hidden costs and support accurate contractor pricing. We’ll finalise this together.
Structural Engineering
I collaborate with a trusted structural engineer—or yours—to deliver the necessary calculations and structural design drawings for your build.
Drainage & Utilities
Where relevant, I manage Thames Water build-over applications and prepare the required drawings. If I can confirm a shared sewer during Stage 2, this will be included in my Stage 2 fee proposal. If it’s only discovered during the commencement of excavation works, I will provide a separate quote for the work needed to obtain Thames Water approval.
Building Control Submission
Full plans submission to your local authority or an approved inspector, including management of feedback until approval is gained.
On-Site Design Handover
I will carry out one site visit at the start of construction to review drawings with your contractor and confirm the design intent. After this, my role as Principal Designer will conclude, and your contractor will assume both design and Principal Designer responsibilities on site.
Estimated Cost (Design Fees)
Small project: £1,000–£1,400
Medium project: £1,400–£1,900
Large/complex: £1,900–£2,500+
50% due upon instruction; balance before Building Control submission. Council/inspector fees not included.
Additional Fees
Structural engineer: £500–£1,500 (complexity dependent).
Optional: Thames Water approval (£180 service fee, excl. TW fee).
Optional: Lighting & electrical drawings — Small £150–£300; Medium £300–£600; Large £600–£900.
Estimated Timeline
1–2 months to submission; Building Control approval typically 5–6 weeks.
Note: Ongoing construction-stage project management isn’t offered at this time, but I remain available for queries and support throughout the technical stages.
Small
£1,000–£1,400
Simple scope
Medium
£1,400–£1,900
Loft + double-storey, etc.
Large / Complex
£1,900–£2,500+
Full refurb / multi-extensions